Service
Construction Administration
We stay engaged through construction — answering RFIs quickly, reviewing submittals against the design intent, walking the site, and helping the contractor solve field conditions without blowing up the schedule.

Capabilities
- RFI and submittal review
- Periodic site observation visits
- Change order and ASI evaluation
- Punch list & commissioning support
- As-built coordination with the trades
- Owner training coordination
Deliverables
- Submittal & RFI logs with responses
- Site observation reports
- Coordinated ASIs and clarifications
- Substantial completion punch lists
Sectors we serve
How we work
- 1
Pre-construction handoff
Before the first RFI lands, we walk the GC and key subs through the design intent, the tricky details, and the assumptions baked into the documents.
- 2
RFI & submittal turnaround
Most RFIs are answered within two business days. Submittals are reviewed against the spec — not rubber-stamped — and returned with clear action items.
- 3
Site observation
Periodic site visits at meaningful milestones — rough-in, above-ceiling, energization, startup — with written observation reports the owner can act on.
- 4
Closeout & training
Punch-list walks, commissioning support, as-built coordination, and owner training so the building runs the way it was designed to.
Frequently asked
- How fast do you turn RFIs?
- Two business days is our standard target. Urgent field stops get a same-day phone call first, written response to follow.
- Will the engineer of record actually visit the site?
- Yes. Senior engineers do site observations — not a junior with a checklist. Reports are signed by the EOR.
- Do you support commissioning?
- We coordinate with the commissioning agent, witness functional testing of MEP equipment, and help close out deficiencies before substantial completion.